Design of the RM1 locomotive depot and railway workshop at Baku Port

Overview
Engineering design of the locomotive maintenance depot and railway workshop (RM1) at the Baku Port

A comprehensive design project for the "Railway infrastructure and locomotive depot for maintenance and operation of diesel locomotives" building at the Port of Baku. The facility is a railway maintenance workshop with a gross area of 378.35 m² and a structural volume of 3,836.54 m³. The building structure is engineered to withstand 8-point seismicity and Zone VI wind loads. The main section consists of a 222.76 m² repair workshop equipped with a 12.5-ton electric overhead bridge crane for locomotive servicing. The repair workshop features a steel frame with walls designed from 60 mm thick sandwich wall panels. The single-story administrative and utility block comprises 15 rooms (training classroom, management offices, canteen, locker rooms, and showers) with walls constructed of 400 mm thick sawn natural limestone masonry.

Project details
Client
Ministry of Transport of the Republic of Azerbaijan
Location
Republic of Azerbaijan, Baku city, Garadagh district, Alat settlement
Country
Azerbaijan
Category
Infrastructure Works
Duration
1.5 year
Status
Completed
Location
Republic of Azerbaijan, Baku city, Garadagh district, Alat settlement
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB