Design of a container terminal and rail yard in the heavy-lift area at Baku Port
Overview
Design of a 150-slot container yard and 6,588 m of rail tracks with 19 turnouts at the Port of Baku.
A dedicated railway infrastructure and a new single-tier container yard with a capacity of 150 TEU slots have been designed within the heavy lift cargo area of the Port of Baku. The total length of terminal dead-end railway tracks reaches 6,588 linear meters. The rail network comprises 5 loading/unloading tracks, 3 shunting tracks, and 19 turnouts. The track system features a 1,520 mm standard gauge, 5.30 m track centerline spacing, and a minimum curve radius of 180 m. The container platform is fully compliant with GOST 9238-2013 standards, set at 200 mm above top-of-rail and 1,745 mm from the track centerline.
Project details
Client
ЗАО «Бакинский международный морской торговый порт»
Location
Republic of Azerbaijan, Alat settlement, Baku International Sea Trade Port
Country
Azerbaijan
Category
Infrastructure Works
Duration
5 months
Status
Completed
MIRAS team
Tural Rustamli
Chief Structural Engineer
Location
Republic of Azerbaijan, Alat settlement, Baku International Sea Trade Port