Reconstruction of the Gushchu Irrigation Canal and Network in Tovuz District (Lot 7)
An agricultural hydraulic engineering project for the comprehensive rehabilitation of irrigation infrastructure (Lot 7), aimed at securing reliable water supply to agricultural farmlands and household plots in the village of Dondar Gushchu, Tovuz district. The design incorporates canal prism reshaping, impermeable lining installation, flow-control gates, and distribution headworks to eliminate filtration losses.
Technical specifications of the canal network:
• Gushchu Canal (Quşçu arxı): length — 16.86 km, design discharge capacity — 3.00 m³/s (total service area — 2,911 ha, comprising 582 ha of household plots and 2,329 ha of arable farmlands);
• Distribution Canal 1 (PK-1): length — 1.37 km, discharge — 0.18 m³/s (service area — 170 ha);
• Distribution Canal 2 (PK-2): length — 3.295 km, discharge — 0.50 m³/s (service area — 480 ha);
• Total network length: 21.53 km (combined service area — 3,561 ha).