Reconstruction of the Gushchu Irrigation Canal and Network in Tovuz District (Lot 7)

Overview
Engineering design for the reconstruction of the 21.53 km Gushchu canal network serving 3,561 ha in Tovuz

An agricultural hydraulic engineering project for the comprehensive rehabilitation of irrigation infrastructure (Lot 7), aimed at securing reliable water supply to agricultural farmlands and household plots in the village of Dondar Gushchu, Tovuz district. The design incorporates canal prism reshaping, impermeable lining installation, flow-control gates, and distribution headworks to eliminate filtration losses.

Technical specifications of the canal network:
• Gushchu Canal (Quşçu arxı): length — 16.86 km, design discharge capacity — 3.00 m³/s (total service area — 2,911 ha, comprising 582 ha of household plots and 2,329 ha of arable farmlands);
• Distribution Canal 1 (PK-1): length — 1.37 km, discharge — 0.18 m³/s (service area — 170 ha);
• Distribution Canal 2 (PK-2): length — 3.295 km, discharge — 0.50 m³/s (service area — 480 ha);
• Total network length: 21.53 km (combined service area — 3,561 ha).

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Tovuz district, Dondar Gushchu village
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
1 year
Status
Completed
Location
Republic of Azerbaijan, Tovuz district, Dondar Gushchu village
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB