Conceptual Design of the Alijanchay Reservoir

Overview
Conceptual design of the Alijanchay reservoir: two dam options (39.8M and 164.6M m³) serving 16,100 ha of farmlands

A large-scale conceptual hydraulic engineering project aimed at the comprehensive advancement of water resources and agribusiness infrastructure within the Sheki-Zagatala economic zone. The initiative entails the formulation of a conceptual engineering design for a multi-purpose storage reservoir on the Alijanchay River in the Sheki district. The strategic objective is to secure reliable irrigation across a 16,100-hectare command area, facilitating the agricultural commissioning of 10,500 hectares of newly irrigated lands.

The study establishes two alternative structural development schemes:
• Option I: construction of a 30 m high embankment dam with a crest length of 464 m, forming an impoundment basin with a gross capacity of 39.8 million m³;
• Option II: construction of a 46 m high dam with a crest length of 667 m, delivering an expanded strategic reservoir storage capacity of 164.6 million m³.

The conceptual scope incorporates comprehensive hydrological flood modeling, spillway sizing, alignment studies for main off-take conveyance canals, and sediment management strategies for the mountain river basin.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Sheki district, Alijanchay River basin
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
1 year
Status
Completed
Location
Republic of Azerbaijan, Sheki district, Alijanchay River basin