Design of the Absheron Main Canal channel reconstruction

Overview
Engineering works on the Absheron Main Canal: extensive earthworks and durable concrete bed reinforcement

An engineering project for the comprehensive reconstruction, modernization, and capacity expansion of the Absheron Peninsula's primary water conveyance lifeline — the Absheron Main Canal. The design encompasses extensive earthworks to reshape the canal prism, robust cast-in-place and precast reinforced concrete anti-seepage channel linings, and the rehabilitation of operational hydraulic flow-control structures (aqueducts, regulators, and outlet gates). These engineering measures substantially reduce filtration losses, mitigate waterlogging across adjacent developing urbanized areas, and secure a resilient supply of irrigation and technical water for agricultural plots and industrial facilities throughout the Absheron Peninsula.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Absheron Peninsula, Absheron Main Canal alignment
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
3 months
Status
Completed
Location
Republic of Azerbaijan, Absheron Peninsula, Absheron Main Canal alignment
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB