Detailed design for capital repair of the Sugovushan Dam

Overview
Engineering design documentation for the repair of the Sugovushan dam (5.86M m³), spillways, and outlets

A strategic hydraulic engineering project focused on structural modernization, operational resilience, and safety enhancement for the Sugovushan Reservoir headworks on the Tartarchay River. The scope encompassed the delivery of detailed design-estimate documentation for comprehensive repair, structural retrofitting, and commissioning across the dam and its auxiliary hydraulic structures.

Key engineered interventions comprise:
• Geotechnical stabilization of the embankment dam, crest refurbishment, and restoration of reinforced concrete slope protection against wave action;
• Complete rehabilitation of flood spillway structures, discharge chutes, and stilling basins to handle design flood inflows;
• Mechanical overhaul and modernization of bottom outlet works, including the replacement of high-pressure gates, valves, and hoisting systems;
• Deployment of automated structural health monitoring, piezometers, and real-time SCADA sensor networks.

The project ensures the safe, long-term operation of the 5.86 million m³ reservoir, re-establishing reliable gravity-fed irrigation across extensive agricultural farmlands in the Tartar, Aghdam, Goranboy, Yevlakh, and Barda districts.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Tartar district, Sugovushan settlement, Sugovushan Reservoir
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
1 year
Status
Completed
Location
Republic of Azerbaijan, Tartar district, Sugovushan settlement, Sugovushan Reservoir