Reconstruction of the Yukhary Zeykhur Main Canal: Feasibility Study and Design

Overview
Feasibility study and design for the reconstruction of Yukhary Zeykhur canal: concrete lining and seepage control in Gusar

A major hydraulic infrastructure engineering project aimed at modernizing regional water distribution networks and maximizing water conveyance efficiency across northern Azerbaijan. The assignment encompassed the delivery of a comprehensive Feasibility Study and detailed engineering design documentation for the full reconstruction and capacity upgrading of the Yukhary Zeykhur main canal in the Gusar district.

Key engineered solutions include:
• Optimization of the canal cross-section geometry to restore nominal hydraulic discharge capacity;
• Installation of impervious cast-in-place and precast reinforced concrete channel linings to eliminate subsoil seepage losses;
• Rehabilitation and structural retrofitting of water intake chambers, distribution headworks, and automated flow-control gates;
• Overhaul of crossing structures across natural gullies and regional roadways (inverted siphons, aqueducts, and structural culverts);
• Integration of automated hydrometric telemetry and flow-monitoring instrumentation for real-time water accounting.

Executing the project secures an uninterrupted irrigation water supply for thousands of hectares of high-yield orchards and arable land across the Gusar and Khachmaz districts while mitigating waterlogging along adjacent corridors.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Gusar district, Yukhary Zeykhur canal
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
2 years
Status
Completed
Location
Republic of Azerbaijan, Gusar district, Yukhary Zeykhur canal
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB