Reconstruction of R1 and R33 Highways with Bridge Crossings (76.8 km)

Overview
Working documentation for the reconstruction of 76.8 km of Category III roads (R1 & R33), including 1 new and 11 reconstructed bridges

An engineering project for the preparation of detailed working drawings and design documentation for the reconstruction of Category III highways with asphalt concrete pavement, covering a total length of 76.827 km across three lots in the Republic of Moldova:
1. Section of the R1 road Chisinau – Straseni (km 6+446 to km 24+050, length 17.604 km);
2. Section of the R1 road Bahmut – Ungheni (km 74+177 to km 96+200, length 22.023 km), including the reconstruction design of 3 bridges;
3. Section of the R33 road Hincesti – Lapusna – M1 (km 0+000 to km 37+200, length 37.200 km), including the design of 1 new bridge (km 2+033) and the reconstruction design of 8 bridges.

Project details
Client
State Road Administration (S.A. Administrația Națională a Drumurilor)
Location
Republic of Moldova, R1 (Chisinau – Ungheni) and R33 (Hincesti – Lapusna – M1) routes
Country
Moldova
Category
Transportation Structures
Duration
1.5 years
Status
Completed
Location
Republic of Moldova, R1 (Chisinau – Ungheni) and R33 (Hincesti – Lapusna – M1) routes
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB