Reconstruction of Interfarm Irrigation Network and Settling Basin for Samur-Absheron Canal Headworks

Overview
Rehabilitation of interfarm irrigation network and design of a settling basin at the Samur-Absheron Canal headworks

An engineering infrastructure modernization project for water resources and irrigation management in the Republic of Azerbaijan. The scope encompasses the rehabilitation and upgrading of the regional interfarm distribution network alongside the engineering design and construction of an industrial-scale sedimentation (settling) basin at the headworks intake of the Samur-Absheron Canal (SAC). The engineered hydraulic systems ensure effective desilting, eliminating suspended sediment and bedload gravels from raw river intake, preventing canal siltation, and maximizing conveyance efficiency throughout the downstream agricultural distribution network.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Gusar and Khachmaz districts, Samur-Absheron Canal headworks
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
2 years
Status
Completed
Location
Republic of Azerbaijan, Gusar and Khachmaz districts, Samur-Absheron Canal headworks
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB