Design of a two-sided pier for the Sarzha Multifunctional Marine Terminal at Kuryk Port
Overview
Design of a 195x18.5 m pier, 50 ha dredging works, and 150 m coastal protection at Kuryk port
An engineering and hydraulic project for the construction of a major pier in the Kuryk port, designed for the safe double-sided mooring of grain cargo vessels. The total length of the designed pier is 195.0 m, with a width of 18.5 m. As part of the port infrastructure expansion, the project also incorporates large-scale dredging works across a 50 ha area and the construction of 150 m of coastal protection structures.
Project details
Client
“Sarzha” Multifunctional Marine Terminal
Location
Republic of Kazakhstan, Kuryk port, "Sarzha" MMT
Country
Kazakhstan
Category
Marine Structures, Ports and Berths
Duration
1 year
Status
Completed
Location
Republic of Kazakhstan, Kuryk port, "Sarzha" MMT