Design of a new Araz River channel on the 0-5 km section and headworks intake facility

Overview
Engineering design of a new 0–5 km riverbed and headworks intake facility on the Araz River

A hydraulic engineering and river regulation project designed to manage flood dynamics, stabilize flow capacity, and rechannel stream discharge through the development of design documentation for a new 0–5 km section of the Araz River. The scheme incorporates a heavy-duty headworks intake facility complete with flow-control gates and weir sections. The technical solutions ensure safe floodwater conveyance along the transboundary Araz River, prevent coastal bank erosion, and secure dependable raw water diversion into agricultural irrigation canal networks.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Araz River (0–5 km section)
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
2 years
Status
Completed
Location
Republic of Azerbaijan, Araz River (0–5 km section)
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB