Design of environmental remediation and landscaping for Lake Zigh

Overview
Feasibility study and design for Lake Zigh remediation: cleaning, afforestation, drip irrigation, and treatment plants

A multi-disciplinary environmental rehabilitation and hydraulic infrastructure project for the comprehensive remediation and landscaping of the territory surrounding Lake Zigh in the Surakhani district of Baku. The initiative focuses on restoring the ecological equilibrium across the Absheron Peninsula by remediating historical industrial contamination, rehabilitating the wetland basin, and establishing resilient green shelterbelts powered by water-efficient irrigation networks. The contract delivered a full Feasibility Study and detailed engineering design-estimate documentation.

Key engineered components of the project:
• Environmental remediation and desilting of the Lake Zigh basin and adjacent polluted land corridors;
• Engineering design of a reconstructed regulated water body at the site of Lake Zigh;
• Large-scale greening and afforestation across designated Northern and Eastern sectors;
• Integration of an automated drip irrigation network fed by a Ø315 mm (PE) main water transmission pipeline;
• Design of a modern multi-stage water treatment plant complex for effluent polishing and water reuse;
• Construction of stormwater and runoff conveyance channels utilizing open trapezoidal profiles and enclosed reinforced concrete culverts.

Project details
Client
Ministry of Ecology and Natural Resources of the Republic of Azerbaijan
Location
Republic of Azerbaijan, Baku city, Surakhani district, Zigh settlement, Lake Zigh
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
1 year
Status
Completed
Location
Republic of Azerbaijan, Baku city, Surakhani district, Zigh settlement, Lake Zigh
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB