Engineering Design of the Velvelechay-Takhtakorpu Canal

Overview
Engineering design of the 30 km Velvelechay-Takhtakorpu canal starting from KM 50+800 of SAC

An engineering and hydraulic project for the expansion of water management and irrigation infrastructure in the Republic of Azerbaijan, delivering the comprehensive engineering design documentation for the construction of the Velvelechay-Takhtakorpu main canal. Initiating at KM 50+800 of the Samur-Absheron Canal (SAC), the channel spans an overall length of 30 km. The engineered canal serves as a strategic feeder conduit routing water discharges into the Takhtakorpu Reservoir, ensuring dependable agricultural irrigation and securing water supplies for the Baku and Sumgait metropolitan regions across the Absheron Peninsula.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Guba and Shabran districts, Velvelechay-Takhtakorpu canal route
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
2 years
Status
Completed
Location
Republic of Azerbaijan, Guba and Shabran districts, Velvelechay-Takhtakorpu canal route
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB