Conceptual Design of the Istisu Reservoir and Hydroelectric Power Plant

Overview
Kəlbəcərdə İstisu su anbarı (33,66 mln m³-dək, 100 m bənd) və 3 MVt gücündə inteqrasiya olunmuş SES konsepti

A strategic multi-purpose hydraulic and renewable energy conceptual project designed to harness hydropower potential and advance water resource infrastructure across the Eastern Zangezur economic region. The assignment delivers a comprehensive conceptual design for the high-head Istisu reservoir impoundment in the Kalbajar district, structurally coupled with an integrated run-of-river/storage hydroelectric power plant (HPP) to support flood regulation, water supply, and green electricity generation.

The technical framework outlines four alternative structural development schemes:
• Dam maximum structural height ranges from 80 m to 100 m;
• Crest length spans from 310 m to 386 m;
• Gross impoundment storage capacity scales from 13.27 million m³ up to 33.66 million m³.

Integrated Hydroelectric Power Plant (HPP) specifications:
• Total station generating capacity: 3.0 MW;
• Hydro-mechanical configuration: 4 turbine-generator units (3 active and 1 standby) rated at 1.0 MW each.

The conceptual scope incorporates complex alpine catchment hydrology, seismic and geotechnical slope stability assessments, hydraulic design of high-head pressure conduits and spillways, and electrical interconnection schemes for evacuation into the regional power grid.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Kalbajar district, Istisu settlement
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
1 year
Status
Completed
Location
Republic of Azerbaijan, Kalbajar district, Istisu settlement
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB