Conceptual Design of the Gusarchay Reservoir

Overview
Conceptual design of Gusarchay reservoir: two dam alignments (up to 22.00M m³) irrigating 20,600 ha in Gusar

A large-scale conceptual hydraulic engineering project focused on water resource development and the modernization of irrigation networks across northeastern Azerbaijan. The initiative outlines the establishment of a strategic storage reservoir on the Gusarchay mountain river in the Gusar district. The primary mission of the headworks is to deliver dependable, year-round irrigation across a 20,600-hectare agricultural command area, enabling the agricultural development of 9,900 hectares of newly commissioned arable and orchard lands.

The technical study systematically evaluates two alternative dam axis alignments:
• Alignment 1 (Dam 1):
  – Option 1: a 60 m high dam with a crest length of 268 m, creating an impoundment capacity of 8.96 million m³;
  – Option 2: an 80 m high dam with a crest length of 390 m, yielding an expanded volume of 20.10 million m³;
• Alignment 2 (Dam 2):
  – A 60 m high dam with a crest length of 545 m, impounding a reservoir with a total storage capacity of 22.00 million m³.

The engineering analysis encompasses flood discharge hydrographs, geotechnical foundation assessments, energy dissipation spillway designs, and hydraulic integration into regional conveyance canal arteries.

Project details
Client
“Azerbaijan Melioration and Water Management” OJSC
Location
Republic of Azerbaijan, Gusar district, Gusarchay River basin
Country
Azerbaijan
Category
Hydrotechnical and Melioration Facilities
Duration
1 year
Status
Completed
Location
Republic of Azerbaijan, Gusar district, Gusarchay River basin
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB