Design of two bridge viaducts over the Kudepsta River on the Adler Bypass Highway

Overview
Design of dual viaducts (812.14 m and 557.09 m, G-9.6 gauge) over the Kudepsta River on the Adler Bypass

An engineering project for the bridge crossing over the Kudepsta River, developed as part of the strategic Adler Bypass expressway project. The design entails two independent multi-span bridge structures to separate opposing traffic flows within challenging mountainous and valley terrain. The forward alignment viaduct measures 812.14 m in length, while the return alignment structure spans 557.09 m. Both engineering structures are engineered for heavy dynamic and seismic loads, with roadway widths standardized to the G-9.6 clearance gauge.

Project details
Client
State Company “Russian Highways” ("Avtodor")
Location
Russian Federation, Krasnodar Krai, Sochi (Adler), Kudepsta River
Country
Russia
Category
Transportation Structures
Duration
2 years
Status
Completed
Location
Russian Federation, Krasnodar Krai, Sochi (Adler), Kudepsta River
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB