Design of Phase II expansion of Baku International Sea Trade Port

Overview
Design of Port of Baku Phase 2: 51 ha reclamation, 560 m and 770 m quays, 5-tier container yard, and rail tracks

Comprehensive engineering development project for Phase 2 of the Port of Baku logistics hub in Alat, creating a 51-hectare reclaimed land territory alongside a dedicated deep-water navigation access channel and operational turning basin. The master plan (synthesizing Options 1 and 2) encompasses a 560 m southern quay wall and a 770 m eastern quay wall. The engineering scope delivers a high-density 5-tier container stacking yard, an on-dock railway network, electrical substations, and a comprehensive complex of administrative, customs inspection, and border control facilities.

Project details
Client
Ministry of Economy of the Republic of Azerbaijan
Location
Republic of Azerbaijan, Baku city, Alat settlement, Baku International Sea Trade Port
Country
Azerbaijan
Category
Marine Structures, Ports and Berths
Duration
1 year
Status
Completed
Location
Republic of Azerbaijan, Baku city, Alat settlement, Baku International Sea Trade Port
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB