Design of tunnel-type overpasses on the Horadiz - Jabrayil - Zangilan - Aghband Highway

Overview
Design of 13.0 m tunnel-type overpasses with a 1x11 m layout on the Horadiz-Aghband highway

The project involves the construction of tunnel-type overpasses on the Horadiz-Jabrayil-Zangilan-Aghband automobile road. The structures are located at sections km 81+962, km 82+865, and km 84+515. The total length of the overpass is 13 m, with a structural scheme of 1x11 m.

Project details
Client
Azerbaijan State Agency of Automobile Roads
Location
Republic of Azerbaijan, Horadiz – Jabrayil – Zangilan – Aghband highway (km 81+962, km 82+865, km 84+515)
Country
Azerbaijan
Category
Transportation Structures
Duration
6 months
Status
Completed
Location
Republic of Azerbaijan, Horadiz – Jabrayil – Zangilan – Aghband highway (km 81+962, km 82+865, km 84+515)
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB