Design of a traffic interchange with a tunnel and overpass on Tbilisi Avenue

Overview
A transport interchange with a 280 m tunnel and a 280.0 m overpass with a G-2x9.5 m clearance gauge on Tbilisi Avenue

A road infrastructure project aimed at relieving one of the city's busiest intersections through the efficient separation of traffic flows at different levels. The project includes the construction of an underground section (tunnel) of the transport hub with a length of 280 m. Engineering solutions provide for two independent traffic lanes with a width of 2x9.5 m, which significantly increases the capacity of the intersection.

A vital bridge-type overpass infrastructure project, combining advanced engineering calculation technologies and reliable structural solutions to ensure uninterrupted traffic connections. The total design length of this structure is 280.0 m. The traffic zone is organized as two independent directions of movement, designed with a carriageway gauge of G-2x9.5 m.

Project details
Client
“Azeravtoyol Service” LLC
Location
Baku, Azerbaijan
Country
Azerbaijan
Category
Transportation Structures
Duration
1 year
Status
Completed
Location
Baku, Azerbaijan
/ Start a conversation

Let's Build it

Drag & Drop Files or Browse Files
PDF · DWG · DOCX · XLSX · ZIP · max 50 MB