Design of a bridge over the drainage channel in Kyiv Region

Overview
Design of a 109.0 m three-span bridge crossing with a 30.1+48.0+30.1 m layout over the Drainage Channel in the Kyiv region

An engineering project for a bridge crossing over the Drainage Channel, designed to ensure reliable transport connectivity in the region. The total length of the bridge structure is 109.0 m, with a carriageway clearance of G-6.0 m. The bridge is designed according to a span scheme of 30.1 + 48.0 + 30.1 m. The superstructure is conceived as a monolithic continuous prestressed concrete beam made of B40 class concrete. The end abutments are designed on a high pile foundation, while the intermediate piers are individually designed massive monolithic reinforced concrete structures on a low pile foundation using 35x35 cm prismatic piles.

Project details
Client
“Lebedevka Beach 2” LLC
Location
Ukraine, Kyiv region, Lebedivka (Drainage Channel)
Country
Ukraine
Category
Transportation Structures
Duration
6 months
Status
Completed
Location
Ukraine, Kyiv region, Lebedivka (Drainage Channel)